Moving Walkways

< Back to Current Projects

Making sure our travelers get to where they need to be as quickly as possible is a priority, so construction of moving walkways is underway to enhance mobility at Terminal C!

A set of moving walkways are being constructed between the TSA security checkpoint and the Palm Court, which has more than 30 retail, food and beverage options. The retrofitted walkways will rise about 15 inches from the floor and have an approximate length of 80 feet – from checkpoint to Palm Court – a corridor primarily with one-way pedestrian traffic.

Two sets of walkways will be inside the Pedestrian Bridge, the air-conditioned elevated walkway that will connect from Terminal C to the Terminal Link, Parking Garage C and Train Station. These will be completed when the Pedestrian Bridge opens in Fall 2024.

This will help those with limited mobility to more easily navigate Terminal C.